ocr: Figure2.Howl Long alefect Goes Undetectedand the CosttoFixit Cost/lime fo Corredt Kequirements Sperification a Product Design Specilication Delailed Design Specification - Construction L = Requirements Produd Design Detoiled Design Construction Moinlenonce Specificalion Specification Specification Phase When a Defect is Detected